摘要
加入世界贸易组织后,我国工程造价管理行业受到的最大冲击是工程计价模式问题。阐述了国内现行工程计价模式可能引起的纠纷。提出应以市场为取向,建立市场经济的计价模式,推行工程量清单计价的一些设想。
After entering WTO the most impact in the pricing management trade is the module of engineering pricing. Narrated the existing engineering pricing module in China and the possible problem arising. Pointed out One should be oriented by the market,to establish the pricing module of market economy,carry out the pricing against work load list and other prepositions. 15
出处
《石油规划设计》
2003年第6期15-15,31,共2页
Petroleum Planning & Engineering