摘要
对本厂一、二期电站循环冷却系统进行综合分析,找出一期循环水系统运行问题的症结,通过对一、二期循环冷却水系统综合考虑后进行改造,改造后两期循环水系统均运行良好,并取得明显的经济效益。
Comprehensively analyzing the circulating cooling water and system of Stage Ⅰ and Ⅱ Stations , finding out the crux of the question in the Stage I Circulating Cooling Water System and improving it. After that, the circulating cooling water systems can operate smoothly for Stage Ⅰ and Ⅱ Stations, remarkable economic benefit is obtained.
出处
《冶金丛刊》
2003年第6期27-29,共3页
Metallurgical Collections