3Peter Cowling, Wafa Rezig. Integration of continuous caster and hot strip mill planning for steel production[ J ]. Journal of Scheduling,2000 ( 3 ) : 185-208.
4Park H, Hong Y, Chang S Y. An efficient scheduling algo- rithm for the hot coil making in the steel mini-mill [ J ]. Production Planning & Control 12002,13 ( 3 ) :298-306.
7Cowling .P, Ouelhadj D, Petrovic S. A multi-agent archi- tecture for dynamic scheduling of steel hot rolling [ J ]. Journal of Intelligent Manufacturing, 2003 ( 14 ) : 457- 470.