摘要
三峡双线五级船闸是一个超大型土建施工和机电安装项目,涉及技术复杂、工期紧等制约因素。以合同为基础,加强施工组织设计、总进度研究,全面质量管理、鼓励科技创新和团队精神,使项目按期完工,成功实现试通航。
The Three Gorges double-way and five-step shiplock is a massive civil and electromechanical works, dealing with constraining factors such as sophisticated technologies, tight time schedule, etc. The construction on schedule and successful trial navigation were based on contractual management, supported by construction organization design, study on overall schedule, total quality control, technical renovation and spirit of teamwork.
出处
《中国三峡建设》
2003年第11期30-33,共4页
China Three Gorges Construction