摘要
2001年在对克拉玛依油田高压蒸汽管线进行检验中发现许多严重超标缺陷,针对所发现的缺陷进行分析研究,指出缺陷形成的原因,提出今后在高压管线的检验、设计、安装和使用中应注意的事项。
In 2001 found out many serious out-of-standard defaults inspecting the high pressure steam pipeline in Kelamayi oilfield. The defaults were analyzed, the reasons of the forming of defaults were pointed out and the notices in the future inspection, design, mounting and using of high pressure pipeline were put forward.
出处
《石油化工安全技术》
2003年第6期31-33,共3页
Petrochemical Safety Technology