摘要
通过在工程实际中的应用,改变了原有的高桩码头围囹工艺,提出了不同于以往的围囹工艺新思路,解决了高桩墩式码头现浇桩帽出现的纵向倾斜问题。
This paper presents a new train of thought of the framing scaffold technology, which solves the problem of longitudinal inclination of the cast-in-situ pile caps of high-piled dolphin wharf commonly occurs in those adopting previous framing scaffold technology.
出处
《水运工程》
北大核心
2003年第11期38-39,共2页
Port & Waterway Engineering
关键词
高桩码头
围囹
纵向倾斜
新思路
high-piled wharf
framing scaffold
longitudinal inclination
new train of thought