摘要
文章简述了在长江口实施26t混凝土锚块及90m×16m钢趸船锚固工程的施工工艺、过程和总结,并在设计方案的基础上提出了补充和优化方案,取得了较好的经济效益,为类似工程项目的施工获取了科学的工程数据和施工经验。
This paper introduces briefly the construction technology of the sinking of 26t concrete anchor block and anchoring of 90m×16m steel pontoon, and presents supplementation and optimization schemes on the basis of the design scheme.This project has achieved good economic benefit and obtained scientific engineering data and construction experience for construction of similar engineering projects.
出处
《水运工程》
北大核心
2003年第11期74-76,共3页
Port & Waterway Engineering
关键词
混凝土锚块
钢趸船
锚固
锚链安装
锚坑抛石
concrete anchor block
steel pontoon
anchorage
anchor chain installation
anchor pit riprapping.