摘要
采用高空积累滑移法,利用阶梯形装卸平台,在特大面积多层仓储建筑物流转运中心工程9m宽通道上方,安装42.5m宽、103.60m长的顶棚网架,取得了很好的效果。
The adoption of high altitude combined sliding and use of step-ladder shaped handling platform in the installation construction of the roof grid frame of 42.5m wide and 103.60m long above the 9m-wide passage in the super-large-area multi-storied storage building of the logistics transshipment center project have achieved satisfactory effect.
出处
《水运工程》
北大核心
2003年第11期54-57,共4页
Port & Waterway Engineering
关键词
高空积累滑移法
物流转运中心
阶梯形装卸平台
顶棚网架
high altitude combined sliding method
logistics transshipment center
step-ladder shaped handling platform
roof grid frame