摘要
针对试验采场的工程及水文地质情况,在国内首次试验了底板深潜式离子型稀土矿原地浸析采矿的新方法,主要包括采场规模及储量计算、试验工艺技术流程、试验采场的总体设计、试验过程、试验监测系统及监测结果等。结果表明试验是成功的。
The authors firstly experiment a new mining method on in-situ leaching stope of deeply soleplate ion-absorbed rare earth mine after finding out the engineering geologic and hydrological geologic, the main parts include the scale of the stope and reserves calculation, experimental technologic flow, total design ,experimental course, experimental monitor and results. The results indicates that this experiment is successful.
出处
《化工矿物与加工》
CAS
北大核心
2003年第12期9-11,共3页
Industrial Minerals & Processing
关键词
底板深潜式
离子型稀土矿
原地浸析
deeply soleplate
ion-absorbed rare earth mine
in-situ leaching