摘要
通过对百色水利枢纽和龙滩水电站土地补偿概算单价进行比较分析,找出控制土地补偿的关键因素,对 制定广西实施《大中型水利水电工程征地补偿和移民安置条例》办法和编制两工程调整概算,提供参考。
By comparing and analyzing the budgetary estimate unit price of reservoir submersion land compensation of Baise multi-purpose dam project with that of Longtan hydropower station, pointed out the key factors of controlling land compensation, supplied references for making Guangxi regulation of Land compensation and migration-relocation setting of the large-middle sized hydraulic and hydropower project and adjusting bud-getarys of two projects.
出处
《广西水利水电》
2003年第4期45-49,共5页
Guangxi Water Resources & Hydropower Engineering
关键词
百色水库
龙滩水库
水库淹没
土地补偿
补偿单价
移民安置
Baise multi-purpose dam project
Longtan hydropower station
reservoir submersion
land
compensation unit price
comparison