摘要
通过对全省世行贷款NAP和FRDPP项目林分抚育间伐的典型抽样和全面调查,分析了项目林分无法开展正常抚育间伐的成因,并提出了今后合理开展林分抚育间伐的具体建议。
By means of typical sampling and overall investigation on the intermediate cutting in the stands of World Bank Loan 'National Afforestation Project' and 'Forest Resources Development and Protection Project' in Jiangxi Province, the reasons why intermediate felling cann't be carried out normally in the stands are analyzed and several suggestions on the rational development of intermediate felling are made.
出处
《江西林业科技》
2003年第6期42-44,共3页
Jiangxi Forestry Science and Technology
关键词
世行贷款项目林分
抚育间伐
调查
Stands of World Bank Loan Projects
Intermediate felling
Investigation