摘要
本文介绍了云南澜沧江集控中心建设的现状,针对存在的后续接入巨型电站可靠接入,现有的双网络、集中式数据库无法满足日益扩大的集控规模需求,而且对安全运维带来较高的风险,提出了对整个系统按模块化、结构化设计、具有良好开放性和可移植性的分布式集控系统重新改造的设计思路,引领了新型的巨型水电站集控中心的发展方向。
This article describes the Lancang River in Yunnan centralized control center construction status,follow-up access for the existing power plants and reliable access to the giant,the existing dual network,centralized database can not meet the growing demand for centralized control of scale,but also to bring safe operation and maintenance higher risk presented by the entire system modular,structural design, with good openness and portability of distributed control system set to reinvent design ideas.Leading the new giant hydropower station centralized control center development.
出处
《电子测试》
2013年第12S期133-134,共2页
Electronic Test
关键词
流域集控中心
分布式
改造
Watershed centralized control center
distributed
transformation