基于三维有限元的公路桥梁下穿高铁桥梁影响性分析 被引量:5

Influence analysis wearing high iron bridge three-dimensional finite element based on the highway bridge
下载PDF
导出
摘要 对某公路桥梁下穿高铁桥梁进行了三维有限元模拟,分析了公路桥分别采用简支梁桥和桩板梁桥时对高铁桥梁的影响。结果表明,两种方案都不会对影响高铁桥梁的结构安全和运营安全;简支梁公路桥下穿对高铁桥梁的影响相对较小。 Railway engineering project cost basis of survey data,is one of the basic work of railway construction cost of preparation and construction design work.Detailed engineering degree and temporary survey estimates the number of columns has an important impact on the reasonableness of the railway construction project investment control and follow-up for the progress and quality assurance plays a very important role.In this paper,the railway project cost basis information to investigate and estimate the number of temporary works out the actual work experience,to investigate the scientific basis of the information to determine the reasonableness of the number of temporary works to provide a reference,so the reasonable control of the investment and ensure the smooth implementation of the project works.
作者 刘宝龙
出处 《电子测试》 2015年第2X期134-136,共3页 Electronic Test
关键词 简支梁 桩板梁 下穿 高铁桥梁 Railroad Basic information Survey Temporary Works
  • 相关文献

参考文献5

二级参考文献24

  • 1.TB10002.1-99.铁路桥涵设计基本规范[S].北京:中国铁道出版社,1999..
  • 2曹雪琴 沈桂平.南昌新溪立交桥试验报告[R].上海:上海铁道大学,1998..
  • 3TB10621-2009,高速铁路设计规范[S].
  • 4中华人民共和国交通部.JTGD60-2004公路桥涵设计通用规范[S].人民交通出版社,2004.
  • 5TB 10106-2010,铁路工程地基处理技术规程[S].
  • 6中华人民共和国铁道部.TBl0621-2009高速铁路设计规范[S].北京:中围铁道出版社,2009.
  • 7JTGD40-2002.公路水泥混凝土路面设计规范[S].[S].,..
  • 8JTJ034-2000.公路路面基层施工技术规范[S].[S].,..
  • 9JTGF30-2003.公路水泥混凝土路面施工技术规范[S].[S].,..
  • 10王午生.铁路线路工程[M].北京:中国铁道出版社,1999.270.

共引文献46

同被引文献18

引证文献5

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部