摘要
本文主要集合南宁市某建筑物的具体施工情况,介绍了在进行建筑施工过程中建筑露面有粘结预应力施工技术,对有粘结预应力施工方法的施工分析,并介绍了预应力施工技术。在实证分析的基础上指出该方法存在不足,并就解决措施进行探讨。
This paper set the specific situation of Nan Ning Construction of a building, introduced during the construction process, the building appeared Bonded prestressed construction technology, to have bonded prestressed construction method of construction analysis, and describes the prestressed construction technology. Based on this method exists on the basis of empirical analysis of deficiencies and to discuss solutions theory.
出处
《电子测试》
2015年第10X期61-62 66,共3页
Electronic Test