介绍变电站综合自动化改造的思路及改造后防误闭锁系统功能,两套防误系统同时存在时运行及操作注意事项,改造过程中如何对新的防误闭锁系统全面验收。
This essay informs the idea of substation comprehensive automation transformation and the function of anti-mistake interlocking system after transformation.It illustrates points for attention in operating and running while two sets of anti-mistake system exist at the same time.It explains the solution to comprehensive acceptance about new anti-mistake interlocking system during the transformation.
出处
《电子测试》
2016年第22期18-19,共2页
Electronic Test
关键词
综合自动化改造
变化
操作
验收
Comprehensive automation transformation
Change
Operation
Acceptance