摘要
介绍渤海锦州 2 0 - 2天然气处理厂的透平膨胀 /发电机组 ,重点讨论机头主轴前推力偏高产生的原因 。
It is introduces that turbo expander and generator set installed at CNOOC's Gas Process Plant in JinXi. Especially it discusses the cause that forward force from the principal axis of head is higher then normal. And the method to solve the problem is given.
出处
《中国海上油气(工程)》
2003年第5期40-44,共5页
China Offshore Oil and Gas