从垃圾电厂建设规划阶段、设计阶段、施工阶段、运行阶段的全生命周期角度,论述了BIM在电厂全生命周期中的作用.通过对BIM模式与传统模式进行对比,总结了BIM模式的优势.BIM在垃圾环保电厂建设全生命周期的管理是对电厂建设集成化管理的具体体现.通过提供并移交高品质的设计成品,保证了生产运行精细高效.同时提出了BIM技术在垃圾电厂建设中的问题和推广建议,为推动BIM技术在垃圾环保电厂建设全生命周期的广泛应用提供参考.
From the perspective of full life cycle in the planning stage,design stage,construction stage and operation stage of garbage power plant,the role of building information model(BIM)in full life cycle of power plant is discussed.By comparing the BIM mode with the traditional mode,the advantages of the BIM mode are summarized.BIM management in the full life cycle of the garbage power plant construction is embodiment of integrated management in power plant construction.By providing and delivering high quality design products,the fine and efficient operation is ensured.By promoting BIM technology in garbage power plant construction,we suggest to popularize the application of BIM technology to full life cycle of garbage environmental protection power plants and some problems needing attention.
作者
吴浩麒
张颖
WU Haoqi;ZHANG Ying(East China Electric Power Design Institute Co.,Ltd.,Shanghai 200063,China)
出处
《武汉大学学报(工学版)》
CAS
CSCD
北大核心
2017年第A01期99-102,共4页
Engineering Journal of Wuhan University
关键词
BIM
垃圾电厂
环保
全生命周期
BIM
garbage power plant
environmental protection
full life cycle