摘要
为缩短核电厂建造工期、提高质量、降低造价,对核电厂关键路径上的安全壳钢衬里采用模块化施工进行了研究.钢衬里采用模块化施工时,各工序可深度交叉,减少现场焊接等工作量,从而对工程质量有很大的保障.
In order to shorten nuclear power plant construction period,improve quality and reduce cost,the containment of nuclear power plant on the critical path of steel lining adopts modularized construction is the main research object.The modularized construction for steel lining can realize deep-cross of every construction process and reduce the workload of welding,etc.,so as to guarantee the construction quality.
作者
程胜迟
CHENG Shengchi(Tianjin Electric Power Construction Co.,Ltd.,China Energy Engineering Group,Tianjin 300041,China)
出处
《武汉大学学报(工学版)》
CAS
CSCD
北大核心
2017年第A01期530-533,共4页
Engineering Journal of Wuhan University
关键词
钢衬里
模块化施工
吊装网架
安全壳
steel lining
modularized construction
suspension frame
hard shell