摘要
介绍了某框架涵顶进工程概况 ,阐述了其工程施工难点 ,从线路加固和顶进施工两方面 ,提出了具体的施工方案和施工组织安排 。
The general situations of jacking construction of frame culvert are introduced. Based upon analysis of difficulties from two aspects: reinforcement and jacking construction the practical construction scheme and construction management plan are proposed. In addition the prospect of technology is described.
出处
《山西建筑》
2003年第18期78-79,共2页
Shanxi Architecture