期刊文献+

孤东油田高压调整井固井技术 被引量:1

CEMENTING TECHNOLOGY FOR HIGH PRESSURED ADJUSTMENT WELL IN GUDONG OILFIELD
下载PDF
导出
摘要 通过对孤东油田的固井技术研究 ,总结了高压调整井的固井技术措施 ,解决了高压调整井固井的技术难题。研究与应用结果表明 ,套管外封隔器可有效地防止注水泥过程中及封固后油气上窜或层间窜扰 ;早强水泥浆体系可有效地提高水泥石的早期强度 ;管外封隔器和早强水泥浆体系配合使用能够明显提高高压调整井的固井质量 。 Studies were conducted aiming to solve the cementing technic al problem s in high pressured adjustment wells in Gudong Oilfield, and some efficient meas ures were concluded. Study showed that the external casing packer can effectivel y prevent oil and gas channeling during and after cementing, while early strengt h cement slurry can effectively improve the early strength; by combining use of the ECP and early strength cement slurry system, cementing quality of high press ured adjustment wells can be remarkably improved. The study provided a new metho d of adjustment well cementing.
出处 《石油钻采工艺》 CAS CSCD 北大核心 2003年第6期23-24,共2页 Oil Drilling & Production Technology
关键词 孤东油田 调整井 固井技术 管外封隔器 水泥浆 固井质量 Gudong Oilfield external casing packer adjustment well early strength cement slurry cementing quality
  • 相关文献

同被引文献16

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部