摘要
本文介绍国家'七·五'重点工程——耀县水泥厂2000t/d新型干法水泥生产线的调试过程、工艺线的主要特点,以及参加调试工作的体会。它表明我国2000t/d干法水泥生产线的设计、设备制造和生产调试已经成熟。
This paper gives us an introduction to the major project of the Seventh Five-Year Planning-the dry process production line of 2000t / d capcity in Yaoxian Cement Plant. The author describes the commissioning procedure, the main features of the process line and the experience of participating the commissioning work. The sucessful operation of this line clarifies that we have gained ripe experience in designing and manufacturing 2000t/d production line and mastered the commissioning technology to put a new production line on stream and achieve the desirable targets.
出处
《水泥技术》
1992年第3期2-6,共5页
Cement Technology