摘要
本文探讨了双排管桩试验抛填中拉杆出现的一些问题,认为提高拉杆标高、取消钢导梁、增大拉杆间距,可以减轻劳动强度,节省大量投资和有效地缩短工期。
This paper makes investigation on the problems that existed in the pull rods used in double-row pipe pile wharf during dumping fill, and suggest that, if we raise up the elevation of pull rod and take off the steel guide members, as well as increase the span of pull rods, the labour intensity will be reduced, a lot of engineering cost will be saved,and the construction period will be sho-rtened.
出处
《水运工程》
北大核心
1992年第4期23-26,共4页
Port & Waterway Engineering