摘要
简述某钢板桩码头工程施工中,板桩墙的板桩沉不到设计标高的原因及其解决途径。
During construction of a certain steel sheet pile quay wall, a part of sheet piles for the wall can't be piled down to the designed elevation. The reason for this and ways of solving this problem are briefly introduced.
出处
《水运工程》
北大核心
1992年第12期49-51,共3页
Port & Waterway Engineering