摘要
从工艺及设备两方面对连铸Q235铸坯轧制高线废品多进行分析,并采取相应措施,使轧废得到有效控制。
In this paper, the reasons on high rejection rate of high - speed wire rod with Q235 steel billet are analyzes in the view of both process and equipment. It has been controlled effectively with the related measures.
出处
《连铸》
2003年第6期37-38,共2页
Continuous Casting