摘要
对地下室施工过程中基坑支护内支撑的拆除问题进行了讨论,提出并设计了一种“换撑”方案,显著缩短了施工工期,并节约了施工成本,收到了良好的效果。
In this paper, the demolition of the bracing of foundation pit su pp orting in the process of the basement construction is discussed. A scheme of bra cing substitution is given, which turned out to be effective and can definitely reduce the construction period and cost.
出处
《福建建设科技》
2003年第4期28-29,共2页
Fujian Construction Science & Technology
关键词
地下室
工程施工
内支撑拆除
换撑
施工工期
施工成本
bracing demolition
bracing substitution
construction period
con struction cost