摘要
结合某高层框剪商品冬施混凝土方案 ,就其热工计算对混凝土的温度要求作了阐述 ,从混凝土的原材料加温、入罐搅拌、出罐等方面 ,提出了一些技术措施 。
Combined with the winter construction plan of premixed concrete of one tall frame wall structure based upon heat engineering calculation the temperature requirement is elaborated. In addition some technical measures are proposed from some aspects to ensure the premixed concrete quality for winter construction.
出处
《山西建筑》
2004年第2期40-41,共2页
Shanxi Architecture