摘要
该文主要介绍某300MW燃气 蒸汽轮机联合循环发电工程配套的汽轮机抽真空系统工作流程、系统部件以及调试运行情况。
The paper describes the steam turbine's vacuum extraction system matching a 300MW gassteam combined cycle power generating installation. The constituing components as well as the system's ommissiong and its operational behavior are described in addition.
出处
《发电设备》
2004年第1期48-50,共3页
Power Equipment