摘要
125MW汽轮机凝汽器胶球系统由于设计原因,造成系统投运后运行不正常,针对胶球系统存在的问题,找出原因并进行改造。对同类型机组的胶球清洗系统改造有一定的意义。
Due to the design, rubber ball system of condenser for 125MW steam turbine behaved abnormal after the system was put into operation. In view of the problems existing in rubber ball system, the reasons are found out and retrofit is conducted. It will play a significant role in the retrofit of ball cleaning system for similar units.
出处
《汽轮机技术》
北大核心
2003年第6期402-403,共2页
Turbine Technology