摘要
大连市英那河水库扩建工程将原来大坝加高15.1 m,本文介绍了大坝加高方式,新老坝坝体结合和加高后 坝体稳定分析。
The original dam in Yingnahe reservoir of Dalian city is heightened with 1. 5 m in extension project. The paper introduces the mode of dam heightening, the connection of new and old dam body and the stabilization analysis of dam body after dam heightening.
出处
《东北水利水电》
2003年第11期13-14,共2页
Water Resources & Hydropower of Northeast China
关键词
大坝加高
新老坝体结合
英那河水库
dam heightening
connection of new and old dam
Yingnahe reservoir