摘要
介绍了大采高工作面过上层煤柱影响区域的顶板压力情况及采取的有效措施,简述了大采高工作面顶板活动规律及过上层煤柱影响区域时应注意的问题与经验。
This paper introduces the roof pressure situation of the areas influenced by the top coal pillar and some effective measures that should be taken, and expounds briefly the moving laws of the roof of the working face and some matters needing attention in passing through the areas influenced by the top coal pillar.
出处
《科技情报开发与经济》
2003年第12期278-279,共2页
Sci-Tech Information Development & Economy
关键词
大采高
上层煤柱
矿压
综采工作面
top coal pillar
mine pressure
comprehensive mechanized mining face