摘要
合理设置型钢剪力架是避免设置柱帽和板托,同时有效提高板柱节点抗冲切承载力的最受欢迎的有效手段。由于我国的型钢剪力架多为用型钢焊接成型,其能否象整铸成型型钢剪力架那样发挥作用,一直是工程界所关心的重要课题。本文通过现场实测和计算分析结果的对比,得出了只要焊接措施得当。
Disposing welding section steel cross bridging in the slab-column system is a good means to avoid disposing abaci and elevating shear resistance.The bridging is welded in our country.Engineers concern whether it can work like cast iron bridging.We experiment and conclude it can work properly if welding lines is good.
出处
《低温建筑技术》
2003年第6期48-49,共2页
Low Temperature Architecture Technology
关键词
型钢剪力架
试验测试
计算分析
section steel cross bridging
experimental testing
enumerative analysis