期刊文献+

海洋平台安装施工中的接桩卡具 被引量:2

The Bear Clamp Design for Pile Extension during the Installation of Jackets at Sea
下载PDF
导出
摘要 桩基础是海洋平台的主要基础形式,海上结构物的钢管桩基础具有桩径大、桩身长的特点,在海上进行接桩施工是海洋平台建造和安装中不可缺少的工序。本文针对海上接桩施工的特点及其面临的实际问题,结合某实际工程介绍一种实用的接桩卡具,并对这一卡具的设计方法及受力特点进行了详细的分析。 Since the length of the pile foundation of an offshore platform usually exceeds 80 meters or more, so the pile cannot driven into the soil under the sea bed as a whole. It has to be cut into several segments driven into the sea and than join together one by one. A bear clamp is then proposed to do this operation,which can help to prove the accuracy and meet the requirement of the construction. The conformation,design method and bearing characters of the bear clamp are described in detail.
出处 《中国海洋平台》 2003年第6期26-29,共4页 China offshore Platform
关键词 海上油气田 海洋平台工程 钢管桩 接桩卡具 设计 offshore jacket platform, installation, steel pipe pile, bear clamp
  • 相关文献

参考文献3

  • 1钟善桐.钢结构[M].武汉大学出版社,1992..
  • 2.SY/T4802-92.海上固定平台规划、设计和建造的推荐做法. 中国海洋石油天然气行业标准[S].1992.5.4发布,..
  • 3.SY/T 10009-1996.海上固定平台规划、设计和建造的推荐做法--荷载和抗力系数设计法.中国海洋石油天然气行业标准[S].,1997.1.1实施..