摘要
文章主要分析了包钢钢铁双 6 0 0万t时 ,铁路联轨站存在的主要问题及采取的措施。
The problems in the railway junction stations when Baogang aims at double 6 million tons of both iron and steel are analyzed and the countermeasures are also introduced.
出处
《包钢科技》
2003年第6期78-80,共3页
Science & Technology of Baotou Steel