摘要 连续梁桥0#块结构复杂、施工难度大,做好施工过程控制尤为重要。兰渝铁路南充联络线特大桥0#块施工采用了三角支架法,文章介绍了该施工工艺及施工控制要点,以供类似桥梁工程施工参考。 The 0# block of continuous girder bridge has complex structure and difficult construction,thus the good control of construction process is particularly important.The 0# block construction of Nanchong Connection Line Super-large Bridge in Lanzhou-Chongqing Railway used the tripod method,this article described this construction technique and construction control key-points,thereby providing the con-struction reference for similar bridges.
作者 黄春良
出处 《西部交通科技》 2014年第12期27-33,共7页 Western China Communications Science & Technology
关键词 三角支架 临时支座 验算 支架拆除 预压 施工方法 控制要点 Tripod Temporary stent Checking Stent removal Preloading Construction methods Key control points
  • 相关文献

参考文献1

  • 1桥梁施工[M]. 中国铁道出版社, 1997.桥梁施工[M]中国铁道出版社,1997.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部