大藤峡水利枢纽库区码头建设方案的比选分析 被引量:1

Comparison and Selection Analysis of Dock Construction Programs in Datengxia Hydraulic Complex Reservoir Area
下载PDF
导出
摘要 文章结合大藤峡水利枢纽库区码头建设工程实例,根据该项目建设进度以及建设前后水位变化的情况,探讨适合该项目可行性研究阶段的码头建设方案,提出了"二级平台码头结构"与"高桩梁板直立式码头结构"两个建设方案,并通过优缺对比分析,选定"二级平台码头结构方案"为推荐方案,为同类型或类似情况的港口建设方案设计提供借鉴。 Combined with practical wharf construction project of Datengxia Hydraulic Complex reservoir area,and according to the construction progress of this project as well as the water level changes before and after the construction,this article discussed the wharf construction program of this project at feasibility study stage,proposed two construction programs of'two-level platform wharf structure'and'high-pile vertical slab wharf structure',and through the comparative analysis of advantages and disadvantages,it selected'two-level platform wharf structure program'as the recommended program,thereby providing the reference for port construction program design of the same type or under similar situations.
出处 《西部交通科技》 2015年第4期93-96,共4页 Western China Communications Science & Technology
关键词 码头 大藤峡水利枢纽 二级平台结构 高桩梁板直立式码头结构 建设方案 比选 Dock Datengxia Hydraulic Complex Two-level platform structure High-pile vertical slab wharf structure Construction programs Comparison and selection
  • 相关文献

参考文献2

  • 1JTS 167-1-2010.高桩码头设计与施工规范[S]. 2010
  • 2JTS 167-2-2009.重力式码头设计与施工规范[S],2009.

共引文献6

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部