盾构隧道内垂直顶升法研究现状及展望 被引量:6

Review and Prospects on Standpipe Lifting Method in Shield Tunnels
下载PDF
导出
摘要 垂直顶升法具有施工工艺简单、对周边环境影响小等优势,常被用于盾构法取排水隧道工程的立管施工中。文章通过对目前已有的盾构隧道内垂直顶升法相关研究成果进行汇总,总结了垂直顶升法施工工艺、施工过程中顶升力及反力的计算方法、管节及管片的结构设计等方面的研究现状,同时,对垂直顶升法的应用情况进行了综述。研究结果表明:(1)垂直顶升过程中顶升力和反力的计算方法与影响因素不够明确;(2)垂直顶升法中立管和水平特殊衬砌环的设计较粗糙;(3)垂直顶升法主要应用于盾构法取排水隧道工程中。此外,还可应用于长隧道的贯通测量工程中。最后,预测了垂直顶升法未来的研究方向和趋势,未来研究中可以考虑将垂直顶升法改进为竖向顶管法并应用到综合管廊竖井、地铁出入口及风井等建设中。 The standpipe lifting(SL)method is characterized by some advantages,such as simpler construction technology and smaller impacts on the surrounding environment,which is usually applied in the construction of standpipes in the intake or drainage tunnel projects constructed by shield method.By providing a summary of the relevant research results of standpipe lifting method used in the shield tunnels,the current research status of the construction technology,the calculation methods of lifting force and counterforce in the construction process,and the structure design of pipe section and the segment of the SL method are summarized.At the same time,the application cases of standpipe lifting method are introduced.The results show that:(1)The calculation methods and influence factors of lifting force and counterforce during standpipe lifting are not clear enough;(2)The design of standpipes and horizontal special lining ring during standpipe lifting is rough;(3)The SL method is mainly applied in the intake or drainage tunnel projects constructed by shield method.In addition,it can also be applied to through survey project in long tunnels.Finally,it proposes the future research fields and tendency,in which the SL may be improved as the vertical pipe jacking method for construction of the shaft of the utility tunnels,the entrance and exit of the subway and ventilation shaft of the subway.
作者 闫自海 周烽淼 魏新江 王霄 魏纲 YAN Zihai;ZHOU Fengmiao;WEI Xinjiang;WANG Xiao;WEI Gang(PowerChina Huadong Engineering Corporation, Hangzhou 311122;Department of Civil Engineering, Zhejiang University City College, Hangzhou 310015;College of Civil Engineering and Architecture,Zhejiang University, Hangzhou 310058)
出处 《现代隧道技术》 EI CSCD 北大核心 2018年第A02期108-120,共13页 Modern Tunnelling Technology
基金 华东勘测设计研究院科技项目(KY2016-02-29)
关键词 垂直顶升法 顶管 顶力 取排水隧道工程 Standpipe lifting method Pipe jacking Lifting force Drainage tunnel project
  • 相关文献

参考文献13

二级参考文献23

  • 1董胜宪.盾构法施工在电厂取排水工程中的应用[J].电力勘测设计,2004,16(4):47-50. 被引量:3
  • 2DL/T5339-2006火力发电厂水工设计规范[S].
  • 3GB50446-2008,盾构法隧道施工与验收规范[S].
  • 4GB50141-2008,给水排水构筑物工程施工及验收规范[S].
  • 5GB50268-2008给水排水管道工程施工及验收规范[S].
  • 6武汉测绘科技大学.测量学[M].北京:测绘出版社,1996.
  • 7城市测量规范[S].北京:中国建筑工业出版社,1999.
  • 8GB 50208-2002,地下防水工程施工质量验收规范[S].
  • 9GB50141-2008,给水排水构筑物工程施工及验;收规范[s].
  • 10《三门核电厂一期取水涵管工程盾构法隧道垂直顶升施工方案》[C]上海市基础工程有限公司.2011.

共引文献91

同被引文献85

引证文献6

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部