摘要 结合上海诸光路隧道工程,文章对盾构隧道内部双层预制结构体系的现场拼装关键技术进行了分析,主要包括构件的精确定位、接头的处理、专用设备的开发、施工机械的合理选取以及吊装技巧等。通过现场拼装发现立柱预留插筋的准确定位是拼装成功的关键,立柱和车道板的安装关键在于微调,微调需要开发专用设备才能满足精度需求。 Combined with Zhuguang road tunnel project in Shanghai,the key technology of field assembly of double-deck prefabricated structure system in shield tunnels is analyzed,including precise positioning of components,treatment of joints,development of special equipment,reasonable selection of construction machinery and hoisting techniques.It is found that the accurate positioning of the reserved column stiffeners is the key to the success of assembling.The installation and fine-tuning of the columns and lane boards need to develop special equipment to meet the accuracy requirements.
作者 姜海西 JIANG Haixi(Tongji University,Shanghai 200092)
机构地区 同济大学
出处 《现代隧道技术》 EI CSCD 北大核心 2018年第A02期386-391,共6页 Modern Tunnelling Technology
关键词 盾构隧道 双层内部结构 预制拼装 Shield tunnel Double deck internal structure Prefabricated member assembly
  • 相关文献

参考文献7

二级参考文献22

  • 1周松.上海复兴东路越江隧道工程施工技术综述[J].岩石力学与工程学报,2004,23(z2):4761-4769. 被引量:30
  • 2杨继范.双层越江隧道上层道路的施工技术[J].现代隧道技术,2008,45(S1):361-364. 被引量:6
  • 3拓勇飞,舒恒,郭小红,丁文其,王建.超高水压大直径盾构隧道管片接缝防水设计与试验研究[J].岩土工程学报,2013,35(S1):227-231. 被引量:63
  • 4[1]刘建航.上海地铁1号线工程技术总结[R].上海:上海市地铁总公司,1995
  • 5JTGD60-2004.公路桥涵设计通用规范[S].[S].,..
  • 6中交第二公路勘察设计研究院有限公司.南京市纬三路过江通道工程施工图设计文件[R].武汉:2011.
  • 7中华人民共和国行业标准.公路水下隧道设计规范(报批稿)[S].北京:人民交通出版社,2015.
  • 8中交第二公路勘察设计研究院有限公司.优化主河槽隧位埋置深度及安全防范措施研究[R].武汉:2013.
  • 9中交第二公路勘察设计研究院有限公司.合理覆土厚度及安全防范措施研究[R].武汉:2013.
  • 10中交第二公路勘察设计研究院有限公司.管片接缝防水可靠性试验及数值分析研究[R].武汉:2013.

共引文献80

同被引文献47

引证文献4

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部