摘要
为了保障隧道安全,米花岭隧道在设计过程中采取了隐蔽洞口、加固洞口段、加强支护结构和贯彻消防、防水要求等技术措施,以保障战时抗炸、防震、易疏散的要求,并阐述了隧道设计满足战备需要的具体体会。
To ensure the security of the tunnel, we adopted, when designing it, the concealed entrances, reinforced entrance sections,strengthened supports ,pervented fire and proofed water,as well as some other technical measures to meet the requirements in anti-bombing , shock-proofing and easy-to-evacuate. The paper also brings forth some of our practical experience in how to meet the requirements of preparedness against war in the design of tunnels.
出处
《国防交通工程与技术》
2003年第3期6-7,共2页
Traffic Engineering and Technology for National Defence