摘要
提高油管传输射孔与地层测试器联合作业的一次性成功率 ,主要在于提高减震与防漏水平。在安棚油田实施联合作业中 ,通过采取一系列减震与防漏的措施 ,大幅度地提高了射孔 -测试联合作业的成功率。
To increase the success rate of the teamwork between oil tube transport ejection hole and stratum testing set mainly needed to increase the level of shock absorption and leak prevention. When teamwork was put into practice in Anpeng Oilfield, by taking a series of shock absorption and leak prevention measures, the success rate of ejection hole~test teamwork was greatly increased.
关键词
射孔
地层测试
联合作业
减震措施
防漏技术
漏失机理
Oil Test Technology
Oil Tube Transport Ejection Hole
Stratum Test
Shock Absorption
Leak Prevention