安顺电厂二期扩建工程 2× 30 0MW机组需安装烟气脱硫装置。该烟气脱硫装置的土建工程包括脱硫电气控制楼、石膏脱水及储存间、石灰石制备车间、石灰石筒仓、石灰石卸料间、吸收塔基础、事故浆液箱基础、增压风机基础、烟道及GGH支架、综合管道支架、主要的地下水坑及水池等。通过安顺电厂二期扩建工程烟气脱硫装置土建工程的介绍 ,为其他电力建设工程公司进行烟气脱硫装置招、投标提供了工程量的参考。
The FGD device is required for 2×300 MW units in Anshun Power Plant, phase II. Its civil work includes FGD electrical building, gypsum dewatering and storage house, limestone preparation shop; limestone hopper, limestone unloading shop, absorber foundation, emergent slurry tank foundation, booster fan foundation, flue gas duct and GGH support, general pipe support, main underground pit and pool, etc.. The introduction of civil work for FGD device in Anshun Power Plant, phase II can be the reference of work volume for other power construction companies in FGD bidding and tendering.
出处
《电力建设》
北大核心
2003年第12期47-49,共3页
Electric Power Construction