3Kent C D,Becerik-Genber B.Understanding construction industry experience and attitudes toward integrated project delivery[J].Journal of Construction Engineering and Management,2010,136(8):815.
4Volker L,Klein R.Architect participation in integrated project delivery:the future mainspring of architectural design firms[J].Design Management and Technology,2010,5(3):40.
5Leicht R M,Lewis A,Riley D R,et al.Assessing traits for success in individual and team performance in an engineering course[C]//Proceedings from the ASCE Construction Research Congress.Seattle:[s.n.],2009:1358-1367.
6Motiar M R,Kumaraswamy M M.Assembling integrated project teams for joint risk management[J].Construction Management and Economics,2005,5(23):365.
7Dey K P.Integrated project evaluation and selection using multiple-attribute decision-making technique[J].Production Economics,2006,103(4):90.
8Faraj I,Alshawi M,Aouad G,et al.An industry foundation classes Web-based collaborative construction computer environment:WISPER[J].Automation in Construction,2000,10(1):79.
9Rosenman M A,Smith G,Maher M L,et al.Multidisciplinary collaborative design in virtual environments[J].Automation in Construction,2007,16(1):37.
10Chen P H,Cui L,Wan C,et al.Implementation of IFC-based web server for collaborative building design between architects and structural engineers[J].Automation in Construction,2005,14(1):115.