摘要
介绍了钢筋绑扎施工质量控制的过程 ,从调整施工顺序、钢筋焊接施工要点 ,防止框架柱钢筋的位移等方面进行了论述 。
As regards the assembling quality control of reinforcement in this paper from construction sequence, welding construction, reinforcement displacement control in frame column and other aspects discussion is carried out. Author points out that the assembling quality of reinforcement plays an important role in integral quality control.
出处
《山西建筑》
2004年第3期55-56,共2页
Shanxi Architecture