介绍了水峪水库除险加固工程变更的合同管理 ,阐述了工程变更后价款调整的程序及调整原则 ,提出工程变更合同管理的内容和方法 。
The project changes' contraction management in Shuiyu reservoir's danger removing and strengthening work is introduced. The method and principle of cost adjustment after project change are elaborated as well as the content and method of contract management for project change, which has a certain reference value to similar work.
出处
《山西建筑》
2004年第3期126-127,共2页
Shanxi Architecture