八层框架厂房一楼支撑及平台控制爆破拆除 被引量:1

Demolition of Support and Platform of an 8-storey Frame Structured Workshop by Controlled Blasting
下载PDF
导出
摘要  介绍了八层框架楼房底层支撑及平台爆破拆除的技术要点。针对爆破难度大要求高的特点,爆破前对保留和爆破拆除部分进行预处理使其分离,加强对爆破体的防护,爆破采用了非电延时起爆技术,取得了圆满成功。 The key technological points of blasting demolition of for the support and platform of an 8-storey frame-structured building are introduced. In accordance with the characteristics of great difficulty and high requirement in blasting. The building to be remained was separated from the parts to be blasted and was protected emphatically. The non-electric delay detonation was used in blasting to obtain a success.
出处 《爆破》 CSCD 2003年第4期64-66,共3页 Blasting
关键词 厂房 拆除爆破 河南 钢筋混凝土结构 爆破参数 frame-structured workshop controlled blasting key technological points
  • 相关文献

参考文献2

  • 1中国力学会工程爆破专业委员会.爆破工程[M].北京:冶金工业出版社,1992..
  • 2中国人民解放军工程兵司令部.控制爆破[M].北京:中国人民解放军战士出版社,1982..

共引文献4

同被引文献1

  • 1刘殿中.工程爆破使用手册[M].北京:冶金工业出版社,1999..

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部