期刊文献+

GIS在油气田开发管理系统中的扩展实现 被引量:3

Extended realization of GIS in development and management system of reservoir
下载PDF
导出
摘要 由于油气田的开发与空间地理位置密切相关,因而可以在油气田开发管理过程中引入GIS技术.但是油气田开发又具有其特殊性,油气田开发管理GIS除了必须具备基本的GIS功能外,还应采用其他技术来扩展GIS的表现方式,弥补现有地理信息系统在展示方面的不足,进一步完善油气田开发管理地理信息系统.主要从地图投影转换、图层叠加、三维地质模型、地图浏览回放几个方面来阐述如何利用其他技术来实现GIS在油气田开发管理中的扩展.通过对油气田开发管理中GIS技术进行扩展,极大地丰富了地理信息的展现形式,使信息的展示更加直观、形象,增强了GIS的三维空间描述能力和表现手法,将GIS单纯的信息系统发展成为管理与决策支持系统. Owing to the close correlation of development of reservoir and spatial geological place, the technology of GIS can be introduced into the process of development and management of reservoir. But, development of reservoir has its particularity, so, development and management GIS of reservoir should use other techniques to extend the forms of representation, make up the shortages of GIS in representation and more perfect development and management GIS of reservoir besides the basic functions of GIS. This paper expatiates how to use other techniques to extend GIS in development and management in reservoir mainly from map projection transformation, layers of map piling up, and three-dimensional model to repeating playing maps, etc. Through extending GIS of development and management in reservoir, the forms of representation of geological information are enriched, representation of information is more direct and visual, spatial descriptive ability and forms of representation of GIS are built up and the single information system will be developed into a management and decision-making system.
作者 姜玥 谢青
出处 《西南民族大学学报(自然科学版)》 CAS 2003年第6期747-750,共4页 Journal of Southwest Minzu University(Natural Science Edition)
关键词 GIS 油气田开发管理系统 地理信息系统 地图投影 三维地质模型 GIS development of reservoir map projection three-dimensional geological model
  • 相关文献

参考文献3

二级参考文献4

共引文献10

同被引文献24

  • 1李少华,张昌民,李琴.基于GIS的储层随机建模方法[J].地理空间信息,2004,2(1):32-35. 被引量:5
  • 2吴信荣.基于GIS的油田管理信息系统的研制[J].江汉石油学院学报,2004,26(2):151-152. 被引量:14
  • 3陈伟 段永刚 姜玥.基于GIS的油气田开发生产管理系统[A]..第七届联合国计算机会议论文集[C].,2000,11..
  • 4JEFF Coffman. 3-D immersion enhances productivity[R]. The American Oil & Gas reporter, November 1999.
  • 5HE N, REYNOLDS A C, OLIVER D S. Threedimensional reservoir description from multiwell pressure data[A]. paper SPE 36509 Presented at the 1996 SPE Annual Technical Conference and Exhibition[C]. Denver ,CO ,Oct, 1996.
  • 6MOORE I D,GRAYSON R B,LADSON A R. Digital terrain modelling: A Review of Hydrological Geomorphological and Biological Application [M].Hydrological Processes, 1991.5.
  • 7DANIEL J D, RODNEY S S, SCOTT A B. Gas industry-related exploration and production waste "demographics" utilizing GIS [A]. the SPE/EPA Exploration & Production Environmental Conference held in Houston[C]. TX, U. S. A. ,1995. 29720 ect.
  • 8LANDA J L,KAMAL M M,JENKINS C D,et al.Reservoir characterization constrained to well test data: a field example [A]. the 1996 SPE Annual Technical Conference and Exhibition[C]. Denver ,CO,Oct,1996.
  • 9B.Nickle,Dr R.Strickland.Resolving theNightmare of Performance Reporting andPortfolio Management-A Web Based Ap-proach[].Hydrocarbon Economics and E-valuation SymposiumPaper SPE.
  • 10G.M.Skeie.A Web Based System for Re-gional Oil Spill Contingency and EmergencyResponse Planning[].Paper SPE.

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部