摘要
HT-7U is a superconducting tokamak, which is being constructed in Institute of Plasma Physics, Chinese Academy of Sciences. The mission of the HT-7U project is to develop a scientific and engineering basis of the steady state operation of advanced tokamak.The engineering design of the device has been optimized. The RfcD program is going on. Short samples of the conductor and a CS model coil were tested. All the TF and PF coils will be manufactured and tested in Institute of Plasma Physics. Therefore, a 600-meter long jacketing line for cable-in-conduit conductors along with two winding machines, a set of VPI equipment and a test facility for the TF and PF coils are ready in ASIPP now. In this paper, the recent progress of the HT-7U is described.
HT-7U is a superconducting tokamak, which is being constructed in Institute of Plasma Physics, Chinese Academy of Sciences. The mission of the HT-7U project is to develop a scientific and engineering basis of the steady state operation of advanced tokamak.The engineering design of the device has been optimized. The RfcD program is going on. Short samples of the conductor and a CS model coil were tested. All the TF and PF coils will be manufactured and tested in Institute of Plasma Physics. Therefore, a 600-meter long jacketing line for cable-in-conduit conductors along with two winding machines, a set of VPI equipment and a test facility for the TF and PF coils are ready in ASIPP now. In this paper, the recent progress of the HT-7U is described.
基金
This work was supported by the National Meg-science Engineering Project of the Chinese Government.