摘要
阐述了广州地铁 2号线首期工程计划和进度管理的制度、体系、方法和成果 ,以及P3软件在广州地铁的应用。通过加强工程项目管理 。
With an introduction to the project plan, schedule control system, the application of P3 software as well as the practical achievement in the 1 st phase of Guangzhou Metro line 2, the authors argue that an intensified management in a project is the direct guarantee for the time limit of the project.
出处
《城市轨道交通研究》
2003年第6期94-97,共4页
Urban Mass Transit