摘要
平顶山天河盐业有限公司热电车间装有一台1500kW汽轮发电机,由于配置不合理及汽轮机本体存在有一定缺陷,自投产以来发电负荷一直在50%左右,2002年度通过对系统改造后发电负荷基本达到设计要求。
A 1500kW turbogenerator was installed in thermal power plant of Pingdingshan Tianhe Salt Co.,Ltd.Due to the unreasonable disposition and the defects of turbine itself,power generation load was at 50% more or less.Through modification on the system in 2002,the power generation load basically reaches the designed capacity.
出处
《中国井矿盐》
CAS
北大核心
2004年第1期44-45,共2页
China Well and Rock Salt