摘要
介绍了大峡水电站在二期工程施工中对混凝土拌和物原材料、掺和料的检测及对混凝土拌和物质量的控制,保证了大坝混凝土的质量,为大坝顺利通过竣工验收奠定了基础。
The inspection of raw materials and cement mixture, and the quality control of concrete during Phase 2 of construction of Daxia Hydropower Station are introduced, which ensure the concrete quality for building the dam and establish the foundation for check and accept of the project.
出处
《西北水力发电》
2003年第4期29-32,共4页
Journal of Northwest Hydroelectric Power
关键词
混凝土
质量检验
控制
黄河大峡水电站
concrete
inspection
quality control
Daxia Hydropower station on the Yellow River