介绍了地盘子电站发电隧洞工程施工的主要经验,从工程施工实践角度总结了长距离、小断面普通钻爆法施工时如何最大限度地减少施工干扰,提高施工效率的一般原则。
The experience gained from construction of power generation tunnel for Dipanzi power station is introduced in the paper, which shows that in order to minimize disturb, the long distance, small cross section tunnel can be constructed by drilling hole with blasting.